2021年9月1日,一场2022年卡塔尔世界杯预选赛在卢森堡队和阿塞拜疆队之间展开。这是卢森堡大公国国家体育场建成后迎来的第一场正式比赛。在2016年这一足球及橄榄球体育场的招标程序中,gmp·冯·格康,玛格及合伙人建筑师事务所的设计方案在25个竞标者中脱颖而出。新建足球和橄榄球场位于卢森堡市南部,取代了年代久远的原建筑,并在当地建筑师事务所Beng Architectes Associés的配合下建成。
The qualifying match for the 2022 FIFA World Cup in Qatar between Luxembourg and Azerbaijan took place on September 1, 2021, and was the first official match to take place in the new Stade de Luxembourg football and rugby stadium. The design by architects von Gerkan, Marg and Partners (gmp) for the Grand Duchy’s national stadium was the successful winner amongst 25 competitors in the 2016 negotiated procedure. The new construction of the football and rugby arena to the south of the city of Luxembourg replaced the outdated previous structure and was built in cooperation with the local practice Beng Architectes Associés.
卢森堡体育场鸟瞰 © Marcus_Bredt
此次设计任务除了体育场外还包括对大约8公顷的场地进行城市总体规划。新国家体育场位于一条东西方向延伸的地带上,北临A6高速公路,南靠新规划的公路和有轨电车交通线,由此在体育场附近形成了一个交通和换乘中心。
In addition to the design for the stadium itself, the task involved an urban masterplan for the site of about 8 hectares. The new national arena is located on a strip of land that runs from east to west, with the A6 motorway to the north and a planned new road and tramway connection to the south, the latter creating a central traffic and interchange hub close to the stadium.
下沉式停车场 © Marcus_Bredt
在一个下沉式停车场的旁边,卢森堡市 “体育服务”新运营大楼拔地而起。该建筑同样由gmp设计。
Here, in addition to the sunken parking lot, gmp have also designed the new service building for the city of Luxembourg’s Service des Sports.
街景视角 © Marcus_Bredt
新体育场的球场尺寸及空间方案符合国际准则,既符合欧足联最高级别体育场馆类别IV标准,也符合国际橄榄球委员会IRB标准。
The size of the pitch and the facilities at the new arena follow international guidelines, meaning that both the top UEFA stadium category IV and that of the International Rugby Board (IRB) are achieved.
采用了矩形单层看台方案 © Marcus_Bredt
从类型上看,该设计采用了矩形单层看台的方案,四个对角座位区采用斜边设计,其看台一直延伸至赛场边。体育场南面外侧规划了一座含贵宾、媒体、球员和官员使用功能的建筑。
The stadium features an orthogonal layout with a single tier and diagonally-truncated corner areas, with the grandstand reaching all the way down to the edge of the pitch. Towards the south, a building block accommodates the functional facilities for VIPs, the press, players, and officials.
从那里,经过体育场位于新考克舍尔大道一侧前广场主入口可进入商务接待厅及相邻的记者区和多功能厅。
There, directly above the main entrance from the forecourt at the new Boulevard Kockelscheuer, is the access to the business foyer with adjoining press area and multifunctional room, which can also be used independently of sports events.
最高点安装了球场照明设备 © Marcus_Bredt
这些场所也可以在体育赛事之外独立使用。看台遮檐的支撑结构采用双弯角钢桁架组成的环周网格结构,钢桁架随受力分布而逐渐变细,其最高点安装了球场照明设备。
The loadbearing structure of the grandstand roof consists of a grid of double-angulated steel girders that are tapered to reflect the internal forces; the grid of girders rises from all sides of the arena and, at its highest point, carries the pitch lighting system.
体育场内部 © Marcus_Bredt
新体育场有大约9900个座位,在全球范围内算是一个小体育场。因此,设计的目标是在这种规模下仍然能创造出足球场的氛围,同时确保它在城市空间中拥有显著的存在感。为了实现这一目标,设计采用了四周统一的立面结构和简洁而富于质感的支撑结构。
With its 9,900 seats, the new stadium is rather small in relation to global standards. For this reason, the design was aimed at creating the atmosphere of a football arena also at this scale while also, at the same time, achieving a significant presence in the urban ensemble. To achieve this the designer developed a uniform facade structure, as well as a simple geometric loadbearing structure.
简洁而富于质感的支撑结构 © Marcus_Bredt
由金属折边板组成的菱形立面将整个建筑体量整合成一个统一和谐的建筑单体。此外,在建筑二层,建筑上方高耸的桅杆式照明灯围成环形,在外侧界定了比赛场地的范围。
The diamond-shaped folded metal plate structure of the facade has a unifying effect on the overall volume of the building. In addition, at the second level high above the building and seen from outside, the line of lighting fixtures marks the dimensions of the pitch.
室内空间 © Marcus_Bredt
因此,在此显著位置上,体育场观众和过往行人眼前呈现的是一座有着动感和雕塑般外观的建筑体。在夜晚,当体育比赛场地照明灯和被照亮的立面结构在城市空间中熠熠生辉时,这种效果更加明显。
The diamond-shaped folded metal plate structure of the facade has a unifying effect on the overall volume of the building. In addition, at the second level high above the building and seen from outside, the line of lighting fixtures marks the dimensions of the pitch. At this exposed site, this creates a dynamic and sculptural feature that can be seen by both stadium visitors and those driving by. The effect is particularly noticeable at night, when the pitch lighting and the illuminated facade structure radiate out to the city.
夜色下的外立面 © Marcus_Bredt
卢森堡市政府和体育部计划于2021年9月25日为体育场举行正式揭幕仪式,随后是2021年9月26日的 "公共开放日"。
The official opening by the municipality and the Ministry of Sport has been scheduled for September 25, 2021 and will be followed by an “open door” event on September 26, 2021.
外立面 © Marcus_Bredt
立面构件细节 © Marcus_Bredt
设计:福尔克温·玛格与克里斯蒂安·霍夫曼
项目负责人:Jörg Greuel
设计人员:Roman Hepp
合作设计:Beng Architects Associés 建筑师事务所
结构设计:斯图加特sbp 施莱希工程设计咨询有限公司/卢森堡 TR Engineering
机电顾问:科隆ZWP / 卢森堡LuxauTec
媒体技术:贝吉施格拉德巴赫Graner und Partner
项目监控:Paul Wurth Geprolux SA.
业主:卢森堡市建筑局建筑服务部
座席数:9900个
建设周期:2017年–2021年
Design Volkwin Marg with Christian Hoffmann
Project Lead Jörg Greuel
Team Roman Hepp
In association with Beng Architectes Associés
Structural Engineering schlaich bergermann partner, Stuttgart / TR Engineering, Luxembourg
Services Engineering ZWP, Cologne / LuxauTec, Luxembourg
Media Technology Graner+Partner, Bergisch Gladbach
Project Management Paul Wurth Geprolux SA.
Client Ville de Luxembourg, Direction de l‘Architecte, Service Bâtiments
Seats 9,900
Construction Period 2017–2021
总平面图 © gmp Architekten
体育场顶视图 © gmp Architekten
首层平面图 © gmp Architekten
二层平面图 © gmp Architekten
地下层平面图 © gmp Architekten
剖面图 © gmp Architekten
剖立面 © gmp Architekten